Construction on Boulder Velodrome starts Monday!
Submitted by Kris Thompson on
I was told by the Director of Cycling at Boulder Indoor Cycling that all of the permits are done and constructions starts this Monday with them opening no later than November 10! You say you need to see it to believe it, well check back later this week after 303Cycling gets a sneak peek of the facility and the progress they are making.



4 Comments
Drive By
Submitted by Anonymous (not verified) on
Drove by the building today and the door was open on the south east side of the building. It looked like there was an electrician there and another car or two. There was also a heap of scrap wood but I think that has been there a while.
Points: 2
There homepage has been updated
Submitted by 303admin on
http://www.boulderindoorcycling.com/Home.aspx
Points: 3
Status
Submitted by Anonymous (not verified) on
Just drove by the building and there was a truck out front covered with Boulder Indoor Cycling decals and two flags with the logos. Looks like it is on!
Points: 2
Another Drive By
Submitted by Anonymous (not verified) on
Heading east on Pearl there is now a large sign at the corner of Pearl and Frontier advertising the indoor cycling facility. There were also a number of cars around the building.
Looks like the construction has started!
Points: 5