2012 - USA Pro Cycling Challenge Road Closures
Submitted by David on

The USA Pro Cycling Challenge is right around the corner and CDOT has posted a list of road closures for each of the stages.
Here is summary of road closures:
- Aug. 20/Stage 1 from Durango to Telluride: Highways impacted include State Highway 160, State Highway 184, and State Highway 145. Impacts will begin at 10 a.m. and end about 4 p.m.
- Aug. 21/Stage 2 from Montrose to Mount Crested Butte: Highways impacted include US 50, State Highway 135 and Cottonwood Pass. Cottonwood Pass will be closed from Aug. 21 at 3 p.m. until
- Aug. 22 at about 1 p.m. Other impacts will begin at 11 a.m. and end about 4 p.m.
- Aug. 22/Stage 3 from Gunnison to Aspen: Highways impacted include State Highway 135, US 24, Cottonwood Pass, and State Highway 82—Independence Pass. Cottonwood Pass will be closed from
- Aug. 21 at 3 p.m. until Aug. 22 at about 1 p.m. Other impacts will begin at 10 a.m. and end about 6 p.m.
- Aug. 23/Stage 4 from Aspen to Beaver Creek: Highways impacted include State Highway 82, US 24, and US 6. Impacts begin at 9 a.m. and end about 4 p.m.
- Aug. 24/Stage 5 from Breckenridge to Colorado Springs: Highways impacted include State Highway 9 and US 24. Impacts will begin at 10 a.m. and end about 4 p.m.
- Aug. 25/Stage 6 from Golden to Boulder: Highways impacted include State Highway 93, State Highway 119, State Highway 72, State Highway 7, and US 36. Impacts will begin at 11 a.m. and end about 4 p.m.
- Aug. 26/Final Stage/Denver Time Trial: No highways are expected to be impacted. Roads will be closed in downtown Denver, however.
Check out CDOT Details for more up-to-date details


Recent comments